Preparation before a new floor

Old floor removal in Oslo before new flooring

We remove agreed existing flooring as preparation for a new floor and handle disposal, substrate condition and hidden defects as separate scope items.

Calculate price

When the existing floor needs to come up first

Old-floor removal is now a separate Komfortliv service and can be ordered with new flooring or as a stand-alone job. The aim is to expose the subfloor so the next phase can be assessed against the actual visible condition.

Before work starts we clarify floor type, build-up, adhesive or mechanical fixing, room area, access and how the removed material will be handled. Standard removal is not hazardous-material remediation: suspected asbestos, hazardous materials, moisture or structural damage requires separate assessment.

Price after assessment

Price: Confirmed after assessment of flooring type, area, build-up, fixing method, access and waste handling.

The price is confirmed before work after flooring type, area, fixing method and access have been assessed. Waste transport, receiving/disposal fees, parking, tolls and special handling are agreed separately where relevant.

What can the work include?

  • lifting/removing the agreed existing floor finish within the defined area
  • sorting and gathering dismantled material at the worksite
  • removing loose residues that naturally follow from dismantling
  • visual inspection of the exposed subfloor
  • basic clean-up before the next work stage

What is assessed or priced separately?

Waste transport, receiving fees, extensive adhesive grinding, heavy tiles or levelling compounds, moisture, odour, biological damage and hazardous materials are assessed separately. If a new floor will be installed, any need for levelling is assessed before the flooring type and project price are confirmed.

Important: Do not disturb unknown older materials before they have been assessed. Suspected asbestos or other hazardous substances must be handled by the appropriate qualified provider.

Frequently asked questions

How much does old-floor removal cost?

The price is confirmed after we assess the flooring type, area, build-up, fixing method, access and how the removed material will be handled.

Is waste disposal included?

Not automatically. Transport, receiving/disposal charges and other documented outlays are agreed separately.

Can you install the new floor afterwards?

Yes. Laminate, click-parquet, vinyl and herringbone are separate booking services. The subfloor is assessed after the old floor has been exposed.

What happens if damage is found underneath?

Visible moisture, rot, major cracks or structural defects are documented and must be resolved before further work. They are not automatically included in the standard removal price.

Practical information

Flooring service

Price and scope are confirmed before work starts.

  • The final price is confirmed before work starts
  • Materials separate
  • price review or quote after assessment where required
  • Oslo and nearby areas

See all prices

From enquiry to an agreed job

  1. Describe the jobChoose a service and provide the scope, location and preferred date.
  2. Check the price and scopeReview the price basis, any extras and terms before sending your booking.
  3. Agree the practical detailsConfirm the time, access and any materials before the work begins.